The Science of Performance · Publication timetable
Six months from 1 September 2026 · three chapters · 24 publishing weeks · Draft v0.1 — 28 July 2026
One primary piece publishes each week, led by a rotating voice — Rosehill, Josh, Clare, or a customer partner — with choreographed amplification within 48 hours of each key post (repost with commentary → director comments → customer comments). Articles and guides publish to this hub; every piece carries one call to action.
1 September – 25 October 2026 · weeks 1–8
| Week | Lead voice | Content | Formats & assets | Platforms | CTA |
|---|---|---|---|---|---|
| W1 · w/c 1 Sep | Rosehill | Campaign launch — “The hidden cost of getting wetpour wrong”: why Day One tells you almost nothing | Launch post · Day 1 → Year 10 fade animation · Josh 30-sec video | LinkedIn (company) · Josh repost + commentary · director comments | Request the technical presentation |
| W2 · w/c 7 Sep | Surface Design | “What installers wish specifications included” — contractor perspective | Interview-style post · carousel | Customer LinkedIn + Rosehill share · Clare comment | Specification discussion |
| W3 · w/c 14 Sep | Clare | Article: Five Things Architects Should Demand Before Approving a Wetpour Specification | Hub article · saveable checklist carousel · Clare 30-sec video | Hub + LinkedIn (Clare, company share) · director comment | Book a CPD |
| W4 · w/c 21 Sep | Full Urbano | “What overseas customers actually ask for” — climate, UV and the Chilean evidence | Post · Iquique before/after asset | Customer LinkedIn + Rosehill share · Josh repost with materials commentary | Request the technical presentation |
| W5 · w/c 28 Sep | Rosehill | “Why playground failures happen” — appearance isn’t performance | Myth/fact cards · six-hour colour-shift visual | LinkedIn (company) · Josh repost · customer comments | Specification review |
| W6 · w/c 5 Oct | Josh | Article: Why Your Wetpour Specification Should Describe Longevity, Not Day One | Hub article · Day 1 / Day 365 carousel | Hub + LinkedIn (Josh, company share) · Clare + director comments | Book a CPD |
| W7 · w/c 12 Oct | Rosehill | “One long life, or three short ones?” — replacement costs dwarf material savings | Total-cost-of-ownership infographic | LinkedIn (company) · email to specifier list · director commercial commentary | Specification discussion |
| W8 · w/c 19 Oct | Clare | Chapter close — “How to specify properly” + Longevity Specification Checklist launch + CPD invitation | Conversion post · downloadable guide (hub) | LinkedIn (Clare + company) · email · BDMs share with named specifiers · CPD webinar: “Specifying for the decade” | Book a CPD |
26 October – 20 December 2026 · weeks 9–16, then Christmas pause
| Week | Lead voice | Content | Formats & assets | Platforms | CTA |
|---|---|---|---|---|---|
| W9 · w/c 26 Oct | Rosehill | Chapter launch — “TPV isn’t a product”: steel isn’t a manufacturer… | “Steel / concrete / TPV” graphic series | LinkedIn (company) · Josh repost · director comments | Request the technical presentation |
| W10 · w/c 2 Nov | Josh | Article: Whose TPV? Why a Material Category Is Not a Product Specification | Hub article · “Whose TPV?” question-card carousel · Josh 30-sec video | Hub + LinkedIn (Josh, company share) · director comment | Book a CPD |
| W11 · w/c 9 Nov | Full Urbano | Substitution and equivalence as distributors see it — what arrives when the label decides | Interview-style post | Customer LinkedIn + Rosehill share · Clare comment | Substitution review |
| W12 · w/c 16 Nov | Rosehill | “What does ‘or equivalent’ actually mean?” | Myth/fact cards | LinkedIn (company) · Josh repost | Specification review |
| W13 · w/c 23 Nov | Clare | Article: What “Or Equivalent” Should Mean — and How to Assess It | Hub article · Clare 30-sec video | Hub + LinkedIn (Clare, company share) · director comment | Substitution review |
| W14 · w/c 30 Nov | Surface Design | Substitution at site level — what installers are handed vs what was specified (Abacus if participating) | Post · carousel | Customer LinkedIn + Rosehill share | Specification discussion |
| W15 · w/c 7 Dec | Rosehill | “There is only one Rosehill TPV®” — category vs controlled product | Product-identity post + graphic | LinkedIn (company) · full choreography | Request the technical presentation |
| W16 · w/c 14 Dec | Clare | Chapter close + Equivalence Assessment Checklist launch + CPD invitation | Conversion post · downloadable guide (hub) | LinkedIn (Clare + company) · email · CPD webinar: “Categories, products and the ‘or equivalent’ trap” | Book a CPD |
| w/c 21 & 28 Dec | Christmas pause — no scheduled publishing. BDM one-to-one activity only. | ||||
4 January – 28 February 2027 · weeks 17–24
| Week | Lead voice | Content | Formats & assets | Platforms | CTA |
|---|---|---|---|---|---|
| W17 · w/c 4 Jan | Rosehill | Chapter launch — “A great granule can still produce a poor surface” | System decision-tree graphic | LinkedIn (company) · Josh repost · director comments | Project discussion |
| W18 · w/c 11 Jan | Josh | Article: Why Wetpour Should Be Specified as a Complete Surface System | Hub article · Josh 30-sec video | Hub + LinkedIn (Josh, company share) · Clare comment | Project discussion |
| W19 · w/c 18 Jan | Surface Design | Installation and workmanship from the installer’s side — what a good system needs from site | Interview-style post · installer-mistakes series (with Surface Design) | Customer LinkedIn + Rosehill share | Specification discussion |
| W20 · w/c 25 Jan | Rosehill | “Why loose-granule data is not enough” — the client walks on the composite | Composite explainer carousel | LinkedIn (company) · Josh repost | Request test evidence |
| W21 · w/c 1 Feb | Clare | Article: Matching the Specification to the Application | Hub article · Clare 30-sec video | Hub + LinkedIn (Clare, company share) · director comment | Project-specific specification support |
| W22 · w/c 8 Feb | ARC | Specifying a demanding North American project as a system (bonus slot — falls back to a Rosehill-told project story) | Project story post | Customer LinkedIn + Rosehill share · Josh comment | Project discussion |
| W23 · w/c 15 Feb | Rosehill | “Cut 25% of the binder. Cut 25% of the carbon.” — efficient systems | Binder & carbon stat graphic | LinkedIn (company) · director commercial commentary | Specification discussion |
| W24 · w/c 22 Feb | Rosehill | Campaign close + Application & System Specification Guide launch + invitation to the full presentation | Conversion post · downloadable guide (hub) | LinkedIn (full choreography) · email · CPD: the complete “Science of Performance” session | Book a CPD |
Working assumptions behind this draft:
We use cookies to enhance your browsing experience and analyse our traffic. You can choose which cookies to allow below.
These cookies are necessary for the website to function and cannot be switched off. They are usually only set in response to actions made by you.
These cookies help us understand how visitors interact with our website by collecting and reporting information anonymously via Google Analytics.